Lifting plan method statement

This lifting plan sample also provides calculation for sling tension. Additionally you shall be able to select the suitable lifting gear in accordance with the safe working load and weather conditions etc. The current location and the final location of the load to be established. Is the lift area controlled and is everyone clear if the load falls or swings?


Are signaling methods and communication agreed and clear to you?

Statement : We acknowledge to have verified this generic method statement for routine lifting against the activities stated in the permit. Personnel Company Name will provide the following personnel complete with relevant personal protective equipment. Who is responsible for the work done by this plan ? Find below safe work lifting plan template for use in crane lifting process.


The template is pre-completed as a ready to use example for the activity, you can edit it as much as you need to produce a site specific health and safety document for your projects. The provision of adequate information, instruction, training or supervision for everyone involved - Thorough pre-planning of each lifting operation. A lifting plan must be in place before any lifting operation.


This Business Procedure defines Stanwell’s minimum mandatory requirements for conducting lifting operations safely in Stanwell workplaces.

It covers all lifting and hoisting operations using cranes, hoists and winches. Printed copies are UNCONTROLLED. Petroleum Development Oman L. GENERIC METHOD STATEMENT FOR ROUTINE LIFTING ACTIVITY: AREA LOCATION PERMIT NO. SECTION - METHOD STATEMENT 1. Report to Someone Limited nominated representative b. Lifting Operations Before lifting operations begin it is essential that all personnel involved are fully briefed on the significant findings of the risk assessment, the method statement and their individual roles in carrying out the task. Selection of the appropriate rigging gear to suit lifting points and center of gravity.


A new term to some folks is “ method statement ”. During this talk the lifting supervisor will outline the work and identify the main personnel and their responsibilities. This includes the process, procedure, engineering data, costing, public. All personnel will then be asked to sign the toolbox talk attendance record sheet. A method statement is often required to show how you or your company will safely carry out a specific kind of task.


The method statement should outline the hazards involved and include a step by step guide on how to do the job safely. Usually it is just like a manual which is a list of procedures for safe working. Hello, recently came across the need to provide a lift plan , full risk assessment and method statement to deliver to a site a container using a Hiab, as a method of fall protection an inertia reel would be connect to the hook on the crane,I was told this is not acceptable. Generally to make a proper lifting plan , you will have to take into consideration the following points : 1- Conducting a proper site survey (area of lifting ).

Determining the classification of the lifting type, weather it's a routine or non routine lifting. Risk Assessment Shall be done. All safe lifting operations start with a lifting plan. Welcome to the online home of AWR Lift Plan Ltd.


The multiple crane lift plan is designed to address the hazards associated to multiple cranes carrying out a multi crane lift. The plan is available in both Lite and Standard versions. The Lift Plan Details panel identifies the parties involved in the lift and confir- the date and time of the lift - the location of the lift - a description.