Some subsurface construction may require de-watering and groundwater control procedures that are not commonly encountered by construction contract-ors, or the dewatering may be sufficiently critical as to affect the competency of the foundation and design of the substructure. The higher the VS, the more difficult the dewatering. The dryness achieved will be low, the mechanical properties will be low and the flocculant consumption will be high.


When the VS of the sludge is high, it is recommended to add a thickening stepin the process in order to achieve a better dewatering. as PDF File (. pdf ), Text File (.txt) or read online for free.

MR Integrated Services Ltd provides dewatering through vertical well-points in cooperation with MOS Grondwater techniek. A large Dutch company with over 1years experience in dewatering. A series of wells of required depth are created in the vicinity of the excavated area from where the water has to be pumped out. The wells are arranged either in a line or a rectangular form where the wellpoints are created at a distance of at least 2m from each other.


The simplest form of dewatering is sump pumping , where groundwater is allowed to enter the excavation where it is then collected in a sump and pumped away by robust solids handling pumps. The following items should be considered when selecting the proper dewatering method: 1. Amount of water to remove 2.

Maintenance and operation required as a result of the construction operations 3. Length of time to complete the work 4. The space available in the work area 5. Design the dewatering system f or the excavation shown in figure below to lower the ground water tab le to 2. Filter Press (Plate and Frame) Filter Press. Our associates apply decades of experience to every pump that is produced— maximizing our confidence in creating a quality product intended to exceed customer expectations. This will ensure that all personnel understand that the area requires dewatering and must be completed within all permit and plan requirements.


Normally the dewatering process is done by pumping or evaporation and is usually done before excavation for footings or to lower water table. Dewatering the pipeline after the successful hydrotest. A construction project that requires the groundwater table to be lowered at its site must obtain prior approval for the discharge from the city, and at times, the state, environmental agency as well. A city dewatering permit is required to discharge any amount of pumped water into a city sewer. Construction dewatering has existed as a specialty industry for a long time.


Rev Confidential to SCIRT 24. Access to the excavation and top of batter slopes neede or congested sites (wells can be located away from working areas) A good understanding of ground conditions in and around the site and ideally, pumping test data are required to demonstrate suitability. General: It is the intent of these specifications is to provide the requirements for dewatering on the project.

Exhibit II Aquifer Test Notification Form - one page ( PDF KB) iii. The method of deep well dewatering systems is more suitable in areas where deep excavations are performed. This hence demands higher rate of pumping for dewatering.


This is mainly employed for the ground preparation for the construction of tunnels, dams, powerhouses, shafts, and locks. The excavations and the shaft made can be 3feet in depth.